Search filters
Search in title
Search in content
Exact matches only
Filter by Categories
Select all
Academy
AI
Automation
Blog
BPMN
Classification and Standardisation
Common Data Environment (CDE)
Dictionary
Digital Twin
Electrical
Fire
How To
Level of
Management
Organization of information
Procurement
Requirements
Standards
State
Sustainability
Uncategorized

Blog
Digital Construction (electrical)

Industry 4.0 in AEC, means to me a decentralized connection between the physical space and the cyberspace through global connectivity.

Read more…

Exchange Information Requirements (EIR) term introduced by BS EN 19650 replace the PAS 1192 term Employer Information Requirements (EIR) on all projects where BS EN ISO 19650 compliance is required.

Read more…

The term introduced by ISO 19650 typically describes the Tier 1 Main Contractor.

Read more…

breakdown structure to help plan the production of information

Read more…

schedule of information containers and delivery dates, for a specific task team

Read more…

An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail.

Read more…

Quick reference guide

In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison.

PAS references (superseded)ISO References (current)
Pre-contract BEPPre-appointment BEP
Post-contract BEPPost-appointment BEP
LODLevel of information need
graphicalgeometrical
non-graphicalnon-geometrical
project clientsappointing parties
BIM execution planInformation delivery plan – ISO 19650‑1
BIM execution planBIM execution plan – ISO 19650‑2
BIM Maturity LevelBIM Maturity Stage
Built Asset Security Management Plan (BASM)Security Management Plan
Capital/delivery phaseDelivery phase
CDE areaCDE state
CDE sectionCDE state
CDE gateTransition
ContainerInformation container
Data DropInformation Exchange
fileInformation container
documentInformation container
ContractAppointment
EmployerAppointing party
EmployerLead Appointed party (Tier 1)
SupplierAppointed party
Employer’s information requirements (EIR)Exchange information requirements (EIR)
Level of model definition (LOD)Level of information need
Level of detail (LOD)Level of information need
Level of information (LOI)Level of information need
ModelInformation model
PathwaysTrigger Event
Plain language questions (PLQ)Project information requirements (PIR)
Project delivery teamDelivery team
Project Implementation Plan (PIP)Mobilisation Plan
Responsibility matrixAssignment matrix Assignment matrix
Responsibility matrixResponsibility matrix
RoleFunction
Standard Method and ProcedureProject Information Standard
Standard Method and ProcedureProject Information Production Method
SuitabilityStatus
SupplierLead appointed party (tier 1)
Supplierappointed party (tier 2 and below)
Volume strategyFederation strategy
processworkflow
namingidentification
naming conventionidentification convention
the racetrackInformation delivery cycle
supply chaindelivery team
Main ContractorLead Appointed party (Tier 1)

Leave a Reply