Search filters
Search in title
Search in content
Exact matches only
Filter by Categories
Select all
Academy
AI
Automation
Blog
BPMN
Classification and Standardisation
Common Data Environment (CDE)
Dictionary
Digital Twin
Electrical
Fire
How To
Level of
Management
Organization of information
Procurement
Requirements
Standards
State
Sustainability
Uncategorized

CONTENTS

Tier 3

In the construction industry, Tier 3 is a sub-contractor referred in ISO 19650 as the Appointed party and Task Team, with a sub-contract who provides

Read More »

TN system

A system having one or more points of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to that point by

Read More »

top management

person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]

Read More »

Trigger Event

Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger

Read More »

trigger event

a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]

Read More »

TT system

A system having one point of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to earth electrodes electrically independent of

Read More »

Two Stage Open Book

A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability

Read More »