Search filters
Search in title
Search in content
Exact matches only
Filter by Categories
Select all
Academy
AI
Automation
Blog
BPMN
Classification and Standardisation
Common Data Environment (CDE)
Dictionary
Digital Twin
Electrical
Fire
How To
Level of
Management
Organization of information
Procurement
Requirements
Standards
State
Sustainability
Uncategorized

CONTENTS

Contract Particulars

Contract Particulars refer to the document outlining the Framework Agreement’s specific core terms, which may include but are not limited to the Pricing Schedule, Authorised

Read More »

Contractor’s proposals (CP)

Contractor’s proposals (CP) in AEC industry refer to documentation prepared by tenderers for design and build projects or on a traditional contract where the bidder

Read More »

cooperation

The interaction of individuals or task teams who work together to achieve a common goal, it demonstrates the ability to learn from each other. Cooperation

Read More »

coordination

execution of workflow in the correct sequence managed by the competent project team members working together to achieve common, albeit often multifaceted goal. Coordination often

Read More »

Cost Led Procurement

A procurement method introduced by Constructing Excellence and the Cabinet Office intended to allow industry to use its experience and knowledge to develop innovative solutions through leveraging

Read More »

cost plan

statement showing an apportionment of an estimate (3.7.9) or of an agreed budget between cost (3.7.1) headingsNote 1 to entry: For example, the cost plan might be broken down into building elements. [1]

Read More »

Current-carrying capacity

Themaximum current which can be carried by a conductor under specified conditions (Installation method, temperature,grouping,etc.)without its steady-state temperature exceeding a specified value (for example,90 ºCfor

Read More »

Cyber-Physical Systems

Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a

Read More »

Equipment Clearance

Equipment Clearance shall be modelled for use in interference management and maintenance access requirements. It is the minimum space adjacent to the equipment required to

Read More »

Information Controller

Responsible for setup and management of the Common Data Environment (CDE), document submission, RFI and other project document transactions. [Appointment: Lead Appointed Party Information Controller,

Read More »
Classification and Standardisation
Jarek Wityk

Organisational capability

Potential and expertise suggesting ability. Capability implies an organisation’s capacity to engage in a range of constructive activities Organisational capability is also referred to as organisational competence, although

Read More »

Rated current

Value of current used for specification purposes,established for a specified set of operating conditions.

Read More »